Tayota Kamri's repair since 2001
1. Operation manual and to maintenance of the car
2. Engine
2.1. Petrol engines models 1AZ-FE and 2AZ-FE
2.2. Mechanical part of engines of models 1AZ-FE and 2AZ-FE
2.2.1. General information and safety measures on removal of the power unit
2.2.2. Removal of sealant
2.2.3. The specification of types of the applied nuts and bolts
2.2.4. Service of a mechanical part of the engine
2.2.5. General repair operations
2.2.6. Dismantling, check and assembly of a head of the block of cylinders
2.2.7. Dismantling, check and assembly of the block of cylinders
2.2.8. General assembly
2.2.8.1. Installation of balancer shafts
2.2.8.2. Installation of a case
2.2.8.3. Installation of bolts of fastening of a head of the block of cylinders
2.2.8.4. Installation of an asterisk VVT-i
2.2.8.5. Installation of camshafts
2.2.8.6. Installation of the oil pump
2.2.8.7. Installation of an asterisk and chain of the drive of the oil pump
2.2.8.8. Installation of the piston of the cylinder No. 1 in VMT of the end of a step of compression
2.2.8.9. Installation of a chain of the drive of the mechanism of gas distribution
2.2.8.10. Installation of a rotor of the sensor of provision of a bent shaft
2.2.8.11. Installation of a cover of a chain of the drive of the mechanism of gas distribution
2.2.8.12. Installation of the oil pallet
2.2.8.13. Installation of the pump of cooling liquid
2.2.8.14. Installation of the sensor of provision of a bent shaft
2.2.8.15. Installation of a pulley of a bent shaft
2.2.8.16. Installation of the mechanism of a natyazhitel of a chain of the drive of the mechanism of gas distribution
2.2.8.17. Convertion of a natyazhitel of a chain of the drive of the mechanism of gas distribution in the working condition
2.2.8.18. Installation поршеня the first and fourth cylinders in compression step VMT
2.2.8.19. Final assembly of the unit
2.3. Petrol engine of model 1MZ-FE
2.4. Mechanical part of the engine of model 1MZ-FE
2.5. Appendix
2.6. Tables
3. Transmission
4. Running gear
5. Steering
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment




80e768f8

2-2-8-12-ustanovka-maslyanogo-poddona.html

2.2.8.12. Installation of the oil pallet

Fig. 2.163. Places of putting sealant on the surface of the pallet: 1 – sealant


Remove old sealant from the surfaces of connection of the pallet and a case, trying not to damage contact surfaces. Solvent clear contact surfaces. Apply sealant on the surface of the pallet, as shown in the figure 2.163.
The opening in a tube has to provide diameter of the squeezed-out sealant of 4 mm. Details have to be connected during the time specified in the instruction for use of sealant. Otherwise again remove sealant and lay new.
Upon termination of putting sealant the nozzle of a tube has to be removed and cleared of sealant traces, and the tube is densely closed.

Fig. 2.164. Bolts and nuts of fastening of the oil pallet


Install the pallet and tighten two nuts and twelve bolts of fastening of the oil pallet the moment of an inhaling of 9 N · m (fig. 2.164).
Wrap a drain stopper the moment of an inhaling of 25 N · m.

"previous page
2.2.8.11. Installation of a cover of a chain of the drive of the mechanism of gas distribution
following page"
2.2.8.13. Installation of the pump of cooling liquid