Tayota Kamri's repair since 2001
1. Operation manual and to maintenance of the car
2. Engine
2.1. Petrol engines models 1AZ-FE and 2AZ-FE
2.2. Mechanical part of engines of models 1AZ-FE and 2AZ-FE
2.2.1. General information and safety measures on removal of the power unit
2.2.2. Removal of sealant
2.2.3. The specification of types of the applied nuts and bolts
2.2.4. Service of a mechanical part of the engine
2.2.5. General repair operations
2.2.6. Dismantling, check and assembly of a head of the block of cylinders
2.2.7. Dismantling, check and assembly of the block of cylinders
2.2.8. General assembly
2.2.8.1. Installation of balancer shafts
2.2.8.2. Installation of a case
2.2.8.3. Installation of bolts of fastening of a head of the block of cylinders
2.2.8.4. Installation of an asterisk VVT-i
2.2.8.5. Installation of camshafts
2.2.8.6. Installation of the oil pump
2.2.8.7. Installation of an asterisk and chain of the drive of the oil pump
2.2.8.8. Installation of the piston of the cylinder No. 1 in VMT of the end of a step of compression
2.2.8.9. Installation of a chain of the drive of the mechanism of gas distribution
2.2.8.10. Installation of a rotor of the sensor of provision of a bent shaft
2.2.8.11. Installation of a cover of a chain of the drive of the mechanism of gas distribution
2.2.8.12. Installation of the oil pallet
2.2.8.13. Installation of the pump of cooling liquid
2.2.8.14. Installation of the sensor of provision of a bent shaft
2.2.8.15. Installation of a pulley of a bent shaft
2.2.8.16. Installation of the mechanism of a natyazhitel of a chain of the drive of the mechanism of gas distribution
2.2.8.17. Convertion of a natyazhitel of a chain of the drive of the mechanism of gas distribution in the working condition
2.2.8.18. Installation поршеня the first and fourth cylinders in compression step VMT
2.2.8.19. Final assembly of the unit
2.3. Petrol engine of model 1MZ-FE
2.4. Mechanical part of the engine of model 1MZ-FE
2.5. Appendix
2.6. Tables
3. Transmission
4. Running gear
5. Steering
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment




80e768f8

2-2-8-16-ustanovka-mekhanizma-natyazhitelya-cepi-privoda-mekhanizma-gazoraspredeleniya.html

2.2.8.16. Installation of the mechanism of a natyazhitel of a chain of the drive of the mechanism of gas distribution

Fig. 2.170. Scheme of preparation of the mechanism of a natyazhitel of a chain of the drive of the mechanism of gas distribution for installation: 1 – pin; 2 – hook


Press a ratchet, completely drown a plunger of the mechanism of a natyazhitel of a chain and hook on a hook for a pin (fig. 2.170).

Fig. 2.171. Installation of new laying of a natyazhitel of a chain


Establish new laying of a natyazhitel of a chain, as shown in the figure 2.171.
Establish a natyazhitel of a chain, having put two clamps the moment of an inhaling of 9 N · m.

"previous page
2.2.8.15. Installation of a pulley of a bent shaft
following page"
2.2.8.17. Convertion of a natyazhitel of a chain of the drive of the mechanism of gas distribution in the working condition