Tayota Kamri's repair since 2001
1. Operation manual and to maintenance of the car
2. Engine
3. Transmission
4. Running gear
5. Steering
6. Brake system
7. Onboard electric equipment
7.1. General information
7.2. Rechargeable battery
7.2.1. Check of degree of state of charge of the battery
7.2.2. Charging of the rechargeable battery
7.2.3. Charging of completely discharged rechargeable battery
7.2.4. Care of the rechargeable battery
7.2.5. Storage of the rechargeable battery
7.2.6. Check of completely charged rechargeable battery
7.2.7. Removal and installation of the rechargeable battery
7.3. System of power supply
7.4. System of electrostart-up
7.5. Checks of onboard electric equipment
7.6. Tables
8. Body
9. Schemes of electric equipment




80e768f8

7-2-7-snyatie-i-ustanovka-akkumulyatornojj-batarei.html

7.2.7. Removal and installation of the rechargeable battery

At shutdown of the rechargeable battery from memory of the central block of a control system of the engine and the transmission, anti-blocking system of brakes, and also from memory of some other electric devices, for example, of the radio receiver and hours data on the malfunctions taking place are erased. After connection anew program the corresponding devices. Some serially installed radio receivers have a protective code. Which prevents unauthorized use of the radio receiver if its food was disconnected. Power supply of the radio receiver and hours is disconnected if, for example, the rechargeable battery is switched-off, the receiver is removed or the corresponding safety lock fuses.
Turn off nuts and disconnect the "negative" plug and then the "positive" plug from the rechargeable battery.
Turn off a nut of fastening of an arm of the rechargeable battery.
Remove an arm of support of the rechargeable battery.
Remove the rechargeable battery.
Before installation clear polar conclusions of the rechargeable battery, the brass wire brush for this purpose will approach. For prevention of corrosion cover battery conclusions with special lubricant.
You carry out installation of the rechargeable battery to the sequences, the return to removal.
Tighten a nut of fastening of an arm of the rechargeable battery the moment of 6-8 N · m.
Tighten nuts of fastening of plugs of the rechargeable battery the moment of 9-12 N · m.

"previous page
7.2.6. Check of completely charged rechargeable battery
following page"
7.3. System of power supply