Tayota Kamri's repair since 2001
1. Operation manual and to maintenance of the car
2. Engine
3. Transmission
4. Running gear
5. Steering
6. Brake system
7. Onboard electric equipment
7.1. General information
7.2. Rechargeable battery
7.3. System of power supply
7.3.1. General information
7.3.2. Generator
7.3.3. Dismantling, check and assembly of the generator
7.3.3.1. Removal of the generator (model with the engine 1 and 2 AZ-FE)
7.3.3.2. Installation of the generator (model with the engine 1 and 2 AZ-FE)
7.3.3.3. Removal of the generator (model with the engine 1 MZ-FE)
7.3.3.4. Installation of the generator (model with the engine 1 MZ-FE)
7.3.3.5. Dismantling of the generator
7.3.3.6. Check of the relay regulator of tension
7.3.3.7. Check of a rotor
7.3.3.8. Check of contact rings
7.3.3.9. Check of the vypryamitelny block
7.3.3.10. Check of brushes
7.3.3.11. Check of bearings
7.3.3.12. Assembly of the generator
7.4. System of electrostart-up
7.5. Checks of onboard electric equipment
7.6. Tables
8. Body
9. Schemes of electric equipment




80e768f8

7-3-3-12-sborka-generatora.html

7.3.3.12. Assembly of the generator

Establish a generator cover from the drive on a rotor.
Establish a washer.
With plastic brisk install by the hammer the case of the vypryamitelny block. Fix the case by four nuts.
Inhaling moment: 4,5–5,4 N · m.

Fig. 7.29. Installation of insulators


Install four rubber insulators of the case of the vypryamitelny block (fig. 7.29).

ATTENTION
Install insulators carefully, trying not to damage them.

Install the plug and a sealing plate.
Install the vypryamitelny block, having fixed by its four screws.
Inhaling moment: 2,9 N · m.
Install tension relay regulator, having fixed by its four screws.
Inhaling moment: 2,0 N · m.

Fig. 7.30. Installation of the brush holder


Install the brush holder, having fixed by its two screws (fig. 7.30).
Inhaling moment: 2,0 N · m.
Establish a brush holder cover.
Establish a back cover and a plate of the rectifier.
Install the insulator of a conclusion, having fixed it by a nut.
Inhaling moment: 4,1 N · m.
Establish a pulley on a sock of a shaft of a rotor and tighten by hand a nut of fastening of a pulley.

Fig. 7.31. Installation of a pulley of a shaft of a rotor


Holding special 1-A adaptation a dynamometer key, tighten 1-B special adaptation (fig. 7.31).
Inhaling moment: 39 N · m.
Check that special 1-A adaptation was reliably fixed on a rotor.
Clamp special 1-C adaptation in a vice and install the generator on it.
For an inhaling of a nut of fastening of a pulley it is necessary to turn special adaptation (1-A) clockwise.
Inhaling moment: 111 N · m.
Remove the generator from special 1-C adaptation.
Unscrew special 1-B adaptation and remove special devices "1-A" and "1-B".
Make sure that the rotor rotates smoothly, without jamming.

"previous page
7.3.3.11. Check of bearings
following page"
7.4. System of electrostart-up